Energy output per kilowatt-hour is the new benchmark for sustainable data centres.

Published: Last checked:

Data centres should measure useful compute per joule, not total input, as AI workloads make output metrics essential for sustainability and efficiency.

The central measurement problem in datacentres is no longer how much electricity enters a building. It is how much useful computing leaves the building, and how much energy is lost in cooling, power conversion, lighting and other overhead. Two sites can draw the same power, yet one can produce far more usable compute if its processors, accelerators and cooling systems are better matched. A simple consumption figure hides that difference.

This distinction has become strategic because AI workloads are changing the size of the footprint. According to a study by Allianz Trade, the datacentre industry emitted around 286 million tonnes of CO₂ worldwide in 2025, roughly 57% more than earlier estimates had assumed. The German research institute Öko-Institut considers it possible that global electricity consumption by AI datacentres could increase elevenfold between 2023 and 2030. If those directions hold, counting kilowatt-hours alone will say less and less about whether infrastructure is sustainable.

Why input-based metrics are too blunt

Traditional datacentre efficiency has often relied on total energy consumption and capacity figures such as connected load in megawatts. Those numbers describe scale: how much power a site can connect, how large the electrical demand is, how big the facility looks in a capacity plan. They do not describe productivity. A high-load site may deliver a lot of work, a little work, or no work at all depending on how its hardware and cooling are coordinated.

The same weakness appears when sustainability is judged only by energy drawn. A lower input number can make a site look efficient even if it wastes much of that energy on non-computing systems. Conversely, a higher input number can hide a much better output if newer hardware generates more useful results for each joule. The useful question is therefore not only “How much energy goes in?” but “How much computing power comes out, and how little is lost along the way?”

Output metrics turn joules into value

High-performance computing has long used a productivity metric: floating-point operations per second for every watt drawn. By that measure, two clusters with identical power consumption can perform very differently. The metric rewards systems that convert electricity into computational work more effectively, rather than simply consuming less.

For AI, the same logic can be made more specific. Model training can be measured in samples per joule: how many data samples are processed per unit of energy. Large language model inference can be measured in tokens per joule: how much output a model generates per unit of energy. These metrics shift attention from raw electricity use to delivered work.

That shift leads to a counterintuitive but important conclusion: a system that draws more power overall can be more efficient than its predecessor. If a new hardware generation delivers significantly more tokens per joule, it can be the more sustainable choice even if its absolute power draw is higher. Efficiency may come from better output per joule rather than from lower consumption.

The comparison that matters

Measurement approachWhat it recordsWhat it revealsWhat it misses
Total energy consumptionElectricity used by a siteCost and scale pressureWhether the electricity produced useful compute
Connected load in megawattsCapacity or planned power availabilitySize of the electrical infrastructureProductivity of servers, accelerators and workloads
Floating-point operations per second per wattCompute throughput relative to power drawHigh-performance computing efficiencyOverhead around the computing systems
Samples per jouleTraining samples processed per energy unitModel training productivityInference behaviour and site overhead
Tokens per jouleOutput tokens generated per energy unitLarge language model inference productivityTraining workloads and cooling overhead
Power Usage EffectivenessTotal datacentre energy demand compared with computing-system energy demandEnergy lost outside the computing systemsComputing output per joule

Power Usage Effectiveness remains relevant because output metrics alone do not capture everything. A datacentre is efficient only when servers perform well and little energy is lost outside the computing systems. Cooling, power conversion and lighting all consume resources. A value close to 1.0 is considered optimal because it means almost no energy is used outside the servers. However, a strong Power Usage Effectiveness score still does not prove that the workload itself is productive.

Cooling is where the infrastructure argument becomes concrete

Cooling accounts for the largest share of the overhead that sits around the computing systems. That makes it a practical lever: if heat can be captured and removed with less energy and water, more of the building’s electricity can become usable computing. OVHcloud relies on water cooling because water can absorb far more heat than air. Its in-house technology works with a closed loop. Direct-to-chip water blocks sit directly on the CPU and GPU, capture heat right at the source, and carry it through the entire datacentre to dry coolers.

The design logic is clear: heat transfer begins at the processor and accelerator, rather than after the heat has spread through air, racks and room systems. That can improve the match between compute hardware and cooling hardware. The source text, however, stops before presenting a benchmark table or quantified results. Readers should treat the cooling approach as an infrastructure example, not as proof of a specific efficiency gain.

What this means for businesses and readers

For businesses, the practical implication is that sustainability reporting should move beyond facility size and electricity totals. The source also describes growing pressure to measure the industry’s energy and carbon footprint more precisely and to anchor it in regulation. Where and how workloads run increasingly affects a company’s own sustainability performance. A workload placed on newer hardware may consume more total power yet produce more useful output, if samples per joule or tokens per joule improve enough. A workload placed on a site with a strong Power Usage Effectiveness may still be inefficient if the computing layer is poorly matched to the task.

For readers assessing information technology infrastructure, the starting point should be output. Ask whether the metric is tied to the actual job: training, inference, simulation, storage or mixed use. Ask whether the site reports energy lost around the computing systems as well as computing delivered inside them. Ask whether comparisons are made between equivalent workloads, because a higher token count, sample count or floating-point result only matters if the task is comparable.

Uncertainties and limits

The numbers in the source are estimates, not certainties. Allianz Trade’s 286 million tonnes figure for 2025 is described as roughly 57% higher than earlier assumptions, which suggests that measurement methods and prior expectations may still be moving. Öko-Institut’s elevenfold scenario for AI datacentre electricity consumption between 2023 and 2030 is also framed as possible, not guaranteed.

Metric choice carries risk too. Samples per joule and tokens per joule can vary with model architecture, dataset, prompt length, batch size, hardware generation and software efficiency. A system can look better on one metric while using more water or electricity outside the computing systems. Power Usage Effectiveness can be close to 1.0 while the servers themselves produce little useful output. A more balanced assessment therefore needs both sides: output per unit of energy, and overhead outside the computing systems.

The OVHcloud cooling description also has a limit: it explains the architecture, but the source does not provide comparative performance numbers for energy, water or carbon. Dry coolers, direct-to-chip water blocks and closed loops are infrastructure facts, not benchmark results. Without workload-level data, a reader cannot conclude that one cooling design is universally more sustainable than another.

Final assessment

Sustainable datacentre evaluation is moving from “How much energy does the building take?” to “How much useful computing does each joule produce, and how much is wasted before and around the computing systems?” The AI-era footprint described by Allianz Trade and Öko-Institut makes that shift necessary. The metrics described in the source—floating-point operations per second per watt, samples per joule, tokens per joule and Power Usage Effectiveness—offer a more complete picture than connected load or total consumption alone. Infrastructure choices such as water cooling can influence that picture, but only when they are tied to measurable output and transparent overhead.

Sources: Allianz Trade study; Öko-Institut; OVHcloud cooling technology description, all as presented in the source text.